Revolutionising Healthcare with Tata Main Hospital: A Prefab Construction Case Study
The Case
Nestled in the remote expanse of Noamundi, Jharkhand, Tata Steel Main Hospital (Tata Group Healthcare) stands as an innovative medical marvel. Built by Nest-In, this universally designed institution covers an area of 90,000 square feet and is a G + 2 building with 133 beds. This prefabricated hospital serves as a critical healthcare facility for Noamundi and nearby regions like Jaganathpur, Barbil, and Champua. Its groundbreaking construction using prefabricated technology sets this hospital apart.
The Nest-In Solution
Nest-In employed its advanced prefabricated healthcare construction solutions to construct the Tata Main Hospital that now caters to many communities in need. The entire prefab hospital deployment was completed within 18 months, showcasing Nest-In’s ability to build 2x faster than traditional methods.
Comprehensive Facilities
The prefabricated hospital includes an emergency section with a burn ward, 12 fully-equipped OPDs, a radiology department, a general pharmacy, a pathology lab, private and semi-private rooms, modular general wards, administrative rooms, critical care units (ICU and NICU), a labour OT, a dialysis room, an OR complex, a blood bank, and a medical store.
Ancillary Support
The prefab medical building also houses DG transformers, solid waste management, a morgue, laundry services, and an Occupational Health Centre (OHC). The ancillary building is of 8,104 sq.ft.
Enhanced Accessibility
Three lifts, including a dedicated stretcher lift, ensure smooth movement of patients and medical equipment.
Comfort
This prefab medical building design includes thermal and noise insulation, making the indoor environment more habitable, while its construction practices significantly reduce environmental impact.
The prefab medical building has significant thermal and noise insulation to create a comfortable indoor environment.
Safety and Compliance
The prefabricated hospital was built with seismic resistance for Zone 2 and fire resistance for up to 2 hours. It also included a firefighting team, a Medical Gas Pipeline System, and air conditioning, ensuring it met all necessary safety and medical standards.
Sustainability
The construction process used 48% less freshwater and 65% less material sources, and had 53% less greenhouse gas impact than traditional RCC methods.
Conclusion
Tata Steel Main Hospital in Noamundi is a testament to the transformative potential of prefabricated construction technology. By leveraging Nest-In’s innovative solutions, the hospital was built quickly, sustainably, and to high standards of safety and comfort. It stands as a critical healthcare hub for the region, embodying Nest-In’s commitment to building faster, smarter, and greener. This project highlights the future of construction in remote and challenging environments, setting a new benchmark for efficiency and sustainability in healthcare infrastructure.
Posted in HabiNest on Jun 10, 2024.
Contact us
Recent Post
Empowering Businesses with Prefab Solutions
Build Faster and Safer Prefab Accommodation Facilities
Prefab Structures for Modern Healthcare Needs
How Nest-In Is Paving the Way to Rapid Healthcare Infrastructure Solutions
Nest-In Prefab Solutions: A Game-Changer for Prefabricated Hospitals in Unstable Terrains
Category
- Nest-In 46
- HabiNest 58
- MobiNest 134
- Nestudio 31
- EzyNest 20
- Smart EzyNest 5
- ChargeNest 6
- Covid Offerings 4
- Brand 10
Add comment